Activation System Installation
100023-00
Use the following tasks to install the parachute activation system.
Applicable Aircraft Serial Numbers
All
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
ICA009677 (FLAG, REMOVE BEFORE FLIGHT, RED CLOTH, 1.5X4.5)
MS21043-4 (NUT, SLFKG, RDC HEX, CRES, .250-28)
TY24MX_01 (CABLE-TIE, NYLON 6-6, 30LB, 5.50, TY-RAP .5 DIA)
Aircraft System and Number
16-ICON Parachute System (IPS)
Safety Equipment
As Needed
Consumables
None
Task Instructions
1. Fasten the activation handle to the overhead console by position the handle tang in line with the two Click Bond studs and securing with self-locking hex nuts. Place safety pin with ‘REMOVE BEFORE FLIGHT’ flag into activation handle.
Figure 508. Activation Handle, Cockpit Installation
2. Route the rest of the activation assembly through the forward main bulkhead. Be sure that flight controls, engine controls, electrical lines and hydraulic lines are free and clear of the activation cable.
3. Securing activation cable. Apply first cable tie and secure the activation housing to the cable tie mount. Cable tie mount is located on the underside of the center wing skin.
Figure 509. Securing Activation Cable Routing
Note: 
The activation cable can be secured using cable ties.
Route the activation assembly. Apply the second cable tie to secure the activation housing to the cable tie mount. The second cable tie is located on the front side of the center wing skin.
Figure 510. Securing Activation Cable Routing
Note: 
The activation cable can be secured using cable ties or any other suitable method.
The activation cable must also be secured to the firewall drain line using 2 zip ties.
Figure 511. Securing Activation Cable Routing
Note: 
The activation cable can be secured using cable ties or any other suitable method.
Activation cable routed to rocket mount position. After securing the activation cable in the previous step, the activation cable will be in position to connect to the launch tube cone at the rocket mounting point.
Warning: 
Confirm that the safety pin and flag are installed in the activation handle before continuing to rocket installation section.
Verification Method
Verify that the activation cable is properly secured and that the safety pin and flag are correctly installed on the activation handle.